ROAG00ESP Site Information Form (site log) International GNSS Service See Instructions at: ftp://igs.org/pub/station/general/sitelog_instr.txt 0. Form Prepared by (full name) : Hector Esteban Pinillos Date Prepared : 2020-02-24 Report Type : UPDATE If Update: Previous Site Log : roag_20180424.log Modified/Added Sections : 3.3 1. Site Identification of the GNSS Monument Site Name : San Fernando / Spain Four Character ID : ROAG Monument Inscription : None IERS DOMES Number : 13402M007 CDP Number : Monument Description : Concrete pillar. Height of the Monument : 1.5 m Monument Foundation : Top of the roof of the building. Foundation Depth : Marker Description : Date Installed : 2015-09-01T00:00Z Geologic Characteristic : Bedrock Type : Bedrock Condition : Fracture Spacing : Fault zones nearby : Distance/activity : Additional Information : Integrated in the formwork of the building. : 1.5 m above the top of the roof of the building. 2. Site Location Information City or Town : San Fernando State or Province : Cadiz Country : Spain Tectonic Plate : EURASIAN Approximate Position (ITRF) X coordinate (m) : 5105577.352 Y coordinate (m) : -555208.925 Z coordinate (m) : 3769714.099 Latitude (N is +) : +362748.06 Longitude (E is +) : -0061222.59 Elevation (m,ellips.) : 00083.2 Additional Information : National Time Laboratory 3. GNSS Receiver Information 3.1 Receiver Type : SEPT POLARX5TR Satellite System : GPS+GLO+GAL+BDS+SBAS+IRNSS Serial Number : 3013868 Firmware Version : 5.1.1 Elevation Cutoff Setting : 0 deg Date Installed : 2018-02-05T00:00Z Date Removed : 2018-04-16T10:38Z Temperature Stabiliz. : 23 ºC ± 2 ºC Additional Information : Placed inside Time Laboratory. 3.2 Receiver Type : SEPT POLARX5TR Satellite System : GPS+GLO+GAL+BDS+SBAS+IRNSS Serial Number : 3013868 Firmware Version : 5.2.0 Elevation Cutoff Setting : Date Installed : 2018-04-16T10:38Z Date Removed : 2020-02-24T12:50Z Temperature Stabiliz. : 23 ºC ± 2 ºC Additional Information : Placed inside Time Laboratory. 3.3 Receiver Type : SEPT POLARX5TR Satellite System : GPS+GLO+GAL+BDS+SBAS+IRNSS Serial Number : 3013868 Firmware Version : 5.3.2 Elevation Cutoff Setting : 5 deg Date Installed : 2020-02-24T12:50Z Date Removed : CCYY-MM-DDThh:mmZ Temperature Stabiliz. : 23 ºC ± 2 ºC Additional Information : Placed inside Time Laboratory. 3.x Receiver Type : (A20, from rcvr_ant.tab; see instructions) Satellite System : (GPS+GLO+GAL+BDS+QZSS+SBAS) Serial Number : (A20, but note the first A5 is used in SINEX) Firmware Version : (A11) Elevation Cutoff Setting : (deg) Date Installed : (CCYY-MM-DDThh:mmZ) Date Removed : (CCYY-MM-DDThh:mmZ) Temperature Stabiliz. : (none or tolerance in degrees C) Additional Information : (multiple lines) 4. GNSS Antenna Information 4.1 Antenna Type : LEIAR25.R4 NONE Serial Number : 726362 Antenna Reference Point : BPA Marker->ARP Up Ecc. (m) : 000.0000 Marker->ARP North Ecc(m) : 000.0000 Marker->ARP East Ecc(m) : 000.0000 Alignment from True N : 0 deg Antenna Radome Type : NONE Radome Serial Number : Antenna Cable Type : LDF1RK-50A Antenna Cable Length : 45 m Date Installed : 2018-02-05T00:00Z Date Removed : CCYY-MM-DDThh:mmZ Additional Information : 4.x Antenna Type : (A20, from rcvr_ant.tab; see instructions) Serial Number : (A*, but note the first A5 is used in SINEX) Antenna Reference Point : (BPA/BCR/XXX from "antenna.gra"; see instr.) Marker->ARP Up Ecc. (m) : (F8.4) Marker->ARP North Ecc(m) : (F8.4) Marker->ARP East Ecc(m) : (F8.4) Alignment from True N : (deg; + is clockwise/east) Antenna Radome Type : (A4 from rcvr_ant.tab; see instructions) Radome Serial Number : Antenna Cable Type : (vendor & type number) Antenna Cable Length : (m) Date Installed : (CCYY-MM-DDThh:mmZ) Date Removed : (CCYY-MM-DDThh:mmZ) Additional Information : (multiple lines) 5. Surveyed Local Ties 5.1 Tied Marker Name : Tied Marker Usage : Tied Marker CDP Number : Tied Marker DOMES Number : Differential Components from GNSS Marker to the tied monument (ITRS) dx (m) : dy (m) : dz (m) : Accuracy (mm) : Survey method : Date Measured : (CCYY-MM-DDThh:mmZ) Additional Information : 5.x Tied Marker Name : Tied Marker Usage : (SLR/VLBI/LOCAL CONTROL/FOOTPRINT/etc) Tied Marker CDP Number : (A4) Tied Marker DOMES Number : (A9) Differential Components from GNSS Marker to the tied monument (ITRS) dx (m) : (m) dy (m) : (m) dz (m) : (m) Accuracy (mm) : (mm) Survey method : (GPS CAMPAIGN/TRILATERATION/TRIANGULATION/etc) Date Measured : (CCYY-MM-DDThh:mmZ) Additional Information : (multiple lines) 6. Frequency Standard 6.1 Standard Type : EXTERNAL H-MASER Input Frequency : 10 MHz Effective Dates : 2018-02-05/CCYY-MM-DD Notes : Real Observatorio de la Armada (ROA) is : responsible for the realisation of the : legal time in Spain. : External frequency from the active : H-Maser and AOG frequency synthesizer. : UTC(ROA) 6.x Standard Type : (INTERNAL or EXTERNAL H-MASER/CESIUM/etc) Input Frequency : (if external) Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Notes : (multiple lines) 7. Collocation Information 7.1 Instrumentation Type : TWSTFT Status : PERMANENT Effective Dates : 1997-12-01/CCYY-MM-DD Notes : Same frequency and time H-MASER input as POLARX2 7.2 Instrumentation Type : SLR Status : PERMANENT Effective Dates : 1995-12-18/CCYY-MM-DD Notes : Aditional Geophysical Instrumentation : Long Period Sysmometers (P) : Short Period sysmometric local net (P) : Magnetometric registers (P) : Meteorological station (P) 7.x Instrumentation Type : (GPS/GLONASS/DORIS/PRARE/SLR/VLBI/TIME/etc) Status : (PERMANENT/MOBILE) Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Notes : (multiple lines) 8. Meteorological Instrumentation 8.1.x Humidity Sensor Model : Manufacturer : Serial Number : Data Sampling Interval : (sec) Accuracy (% rel h) : (% rel h) Aspiration : (UNASPIRATED/NATURAL/FAN/etc) Height Diff to Ant : (m) Calibration date : (CCYY-MM-DD) Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Notes : (multiple lines) 8.2.x Pressure Sensor Model : Manufacturer : Serial Number : Data Sampling Interval : (sec) Accuracy : (hPa) Height Diff to Ant : (m) Calibration date : (CCYY-MM-DD) Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Notes : (multiple lines) 8.3.x Temp. Sensor Model : Manufacturer : Serial Number : Data Sampling Interval : (sec) Accuracy : (deg C) Aspiration : (UNASPIRATED/NATURAL/FAN/etc) Height Diff to Ant : (m) Calibration date : (CCYY-MM-DD) Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Notes : (multiple lines) 8.4.x Water Vapor Radiometer : Manufacturer : Serial Number : Distance to Antenna : (m) Height Diff to Ant : (m) Calibration date : (CCYY-MM-DD) Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Notes : (multiple lines) 8.5.x Other Instrumentation : (multiple lines) 9. Local Ongoing Conditions Possibly Affecting Computed Position 9.1.x Radio Interferences : (TV/CELL PHONE ANTENNA/RADAR/etc) Observed Degradations : (SN RATIO/DATA GAPS/etc) Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Additional Information : (multiple lines) 9.2.x Multipath Sources : (METAL ROOF/DOME/VLBI ANTENNA/etc) Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Additional Information : (multiple lines) 9.3.x Signal Obstructions : (TREES/BUILDINGS/etc) Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Additional Information : (multiple lines) 10. Local Episodic Effects Possibly Affecting Data Quality 10.x Date : (CCYY-MM-DD/CCYY-MM-DD) Event : (TREE CLEARING/CONSTRUCTION/etc) 11. On-Site, Point of Contact Agency Information Agency : Real Instituto y Observatorio de la Armada Preferred Abbreviation : ROA Mailing Address : Cecilio Pujazon s.n. Primary Contact Contact Name : Hector Esteban Pinillos Telephone (primary) : 34 956 59 92 86 Telephone (secondary) : 34 956 54 54 39 Fax : 34 956 59 93 66 E-mail : hesteban@roa.es Secondary Contact Contact Name : Juan Manuel González Sánchez Telephone (primary) : 34 956 54 54 39 Telephone (secondary) : 34 956 54 56 15 Fax : 34 956 59 93 66 E-mail : jmangon@roa.es Additional Information : http://www.roa.es 12. Responsible Agency (if different from 11.) Agency : Preferred Abbreviation : Mailing Address : Primary Contact Contact Name : Telephone (primary) : Telephone (secondary) : Fax : E-mail : Secondary Contact Contact Name : Telephone (primary) : Telephone (secondary) : Fax : E-mail : Additional Information : 13. More Information Primary Data Center : IGN Secondary Data Center : BKG URL for More Information : Hardcopy on File Site Map : Site Diagram : Horizon Mask : Monument Description : Site Pictures : Additional Information : Antenna Graphics with Dimensions LEIAR25.R4 >From 2018-02-05 +-------+ <-- 0.1995 / \ +---+-------------+---+ <-- 0.1614 TCR | | |---------------------------| |---------------------------------| |---------------------------------------| +---------------------------------------------+ | | | | +-+---------------------------------------------+-+ +-----------------+-------------+-----------------+ <-- 0.0320 BCR | | | | +------x------+ <-- 0.0000 BPA=ARP <-- 0.3802 --> ARP: Antenna Reference Point L1 : L1 Phase Center L2 : L2 Phase Center TCR: Top of Chokering BCR: Bottom of Chokering TGP: Top of Ground Plane BGP: Bottom of Ground Plane TPA: Top of Preamplifier BPA: Bottom of Preamplifier TOP: Top of Pole All dimensions are in meters.