BAKO Site Information Form International GPS Service for Geodynamics 0. Form Prepared by (full name) : Cecep SUBARYA Date Prepared : 17-DEC-1998 Report Type : UPDATE Prepared Using : Microsoft Word Vers.7.0 1. Site Identification of the GPS Monument Site Name : BAKOSURTANAL : Nat. Coordination Agency for Survey and Mapping Four Character ID : BAKO Monument Inscription : Concrete Pilar, 50 cm above ground level IERS DOMES Number : 23101M002 CDP Number : (XXXX) Date Installed : 12-JUN-1981 00:00 UT Geologic Characteristic : Alluvial Bedrock Type : SEDIMENTARY Bedrock Condition : (FRESH/JOINTED/WEATHERED) Fracture Spacing : (1-10 cm/10-50 cm/50-200 cm/over 200 cm) Notes : (multiple lines) Additional Information : size: 50 cm x 50 cm x 150 cm under ground level : Permanent tripod (stainless-still) above the : pillar 2. Site Location Information City or Town : Cibinong State or Province : West Java Country : Indonesia Tectonic Plate : Eurasia Approximate Position X coordinate (m) : -1836968.9684 Y coordinate (m) : +6065617.1296 Z coordinate (m) : -716257.7685 Latitude (deg) : 6.4911 S Longitude (deg) : 106.8489 E Elevation (m) : +158.1365 m (above ellipsoid WGS84) Additional Information : +138.4550 m ( above mean sea level) 3. GPS Receiver Information 3.1 Receiver Type : Dual frequency geodetic Trimble 4000SSE Serial Number : 3305A02491 Firmware Version : 6.12 / 2.12 Date Installed : 07-FEB-1998 00:00 UT day 038 Date Removed : (dd-MMM-yyyy hh:mm UT) Additional Information : (multiple lines) 3.x Receiver Type : Serial Number : Firmware Version : Date Installed : (dd-MMM-yyyy hh:mm UT) Date Removed : (dd-MMM-yyyy hh:mm UT) Additional Information : (multiple lines) 4. GPS Antenna Information 4.1 Antenna Type : 4000ST L1/L2 GEOD Serial Number : 3305A02491 Antenna Height (m) : 1.676 m (vertical measurement) Antenna Reference Point : (ARP/BCR/BPA) Degree Offset from North : 0 degrees Antenna Radome Type : Date Installed : 07-FEB-1998 00:00 UT Date Removed : (dd-MMM-yyyy hh:mm UT) Additional Information : Antenna height refers to bottom of ground plane : measured from station mark. 4.x Antenna Type : Serial Number : Antenna Height (m) : (m) Antenna Reference Point : (ARP/BCR/BPA) Degree Offset from North : Antenna Radome Type : Date Installed : (dd-MMM-yyyy hh:mm UT) Date Removed : (dd-MMM-yyyy hh:mm UT) Additional Information : (multiple lines) 5. Local Site Ties 5.x Monument Name : Site Ref CDP Number : (XXXX) Site Ref Domes Number : (XXXXXXXXX) Differential Components from GPS Mark to Site Reference (ITRS) dx (m) : (m) dy (m) : (m) dz (m) : (m) Accuracy (mm) : (mm) Date Measured : (dd-MMM-yyyy hh:mm UT) Additional Information : (multiple lines) 6. Frequency Standard 6.1 Standard Type : (H-MASER/CESIUM/QUARTZ/INTERNAL/RUBIDIUM) Frequency : Effective Dates : (dd-MMM-yyyy - dd-MMM-yyyy) Notes : (multiple lines) 6.x Standard Type : (H-MASER/CESIUM/QUARTZ/INTERNAL/RUBIDIUM) Frequency : Effective Dates : (dd-MMM-yyyy - dd-MMM-yyyy) Notes : (multiple lines) 7. Collocation Information 7.x Instrumentation Type : DORIS Status : PERMANENT Effective Dates : (19-05-1998 - dd-MMM-yyyy) Notes : Measurement tie by using GPS geodetic : receiver Trimble 4000SSi observation start : 00h:00m finished 23h:59m UT. : (more information contact IGN, Z. Altamimi) 8. Meteorological Instrumentation 8.1 Humidity Sensor Model : Manufacturer : Data Frequency : Accuracy (% rel h) : (% rel h) Effective Dates : (dd-MMM-yyyy - dd-MMM-yyyy) Notes : (multiple lines) 8.2 Pressure Sensor Model : Manufacturer : Data Frequency : Accuracy (mbar) : (mbar) Height Diff to GPS (m) : (m) Effective Dates : (dd-MMM-yyyy - dd-MMM-yyyy) Notes : (multiple lines) 8.3 Temperature Sensor Model : Manufacturer : Data Frequency : Accuracy (deg C) : (deg C) Effective Dates : (dd-MMM-yyyy - dd-MMM-yyyy) Notes : (multiple lines) 8.4 Water Vapor Radiometer : Manufacturer : Distance to GPS (m) : (m) Elev Diff to GPS (m) : (m) Effective Dates : (dd-MMM-yyyy - dd-MMM-yyyy) Notes : (multiple lines) 8.5 Other Instrumentation : (multiple lines) 9. On-Site, Point of Contact Agency Information Agency : BAKOSURTANAL : Nat. Coordination Agency for Surveys and Mapping Mailing Address : Jl. Raya Jakarta-Bogor Km.46 : Cibinong 16911 : Jawa Barat - Indonesia Primary Contact Contact Name : Cecep SUBARYA Telephone (primary) : 62 21 875 7329 Telephone (secondary) : 62 21 875 2062 ext. 297 Fax : 62 21 875 3289 E-mail : geodesi@indo.net.id Secondary Contact Contact Name : Asadi Telephone (primary) : 62 21 875 7329 Telephone (secondary) : 62 21 875 2062 Fax : 62 21 875 3289 E-mail : geodesi@indo.net.id Additional Information : (multiple lines) 10. Responsible Agency (if different from 9.) Agency : (multiple lines) Mailing Address : (multiple lines) Primary Contact Contact Name : Telephone (primary) : Telephone (secondary) : Fax : E-mail : Secondary Contact Contact Name : Telephone (primary) : Telephone (secondary) : Fax : E-mail : Additional Information : (multiple lines) 11. More Information URL for More Information : Hardcopy on File Site Map : Yes Site Diagram : Yes Horizon Mask : 15 degress Monument Description : Yes Site Pictures : Yes Additional Information : Antenna Graphics with Dimensions