LDS1 Site Information Form GPS/GLONASS Campaign IGEX98 0. Form Prepared by (full name) : Dave Lowe Date Prepared : 15-OCT-1998 Report Type : AMENDMENT Prepared Using : MS-WORDPAD 1. Site Identification of the GPS/GLONASS Monument Site Name : Leeds Four Character ID : LDS1 Monument Inscription : LDS1 IERS DOMES Number : 13215M001 CDP Number : XXXX Monument Description : STAINLESS STEEL/BRASS PLATE Date Installed : (dd-MMM-yyyy hh:mm UT) Geologic Characteristic : (BEDROCK/CLAY/CONGLOMERATE/GRAVEL/SAND/etc) Bedrock Type : (IGNEOUS/METAMORPHIC/SEDIMENTARY) Bedrock Condition : (FRESH/JOINTED/WEATHERED) Fracture Spacing : (1-10 cm/10-50 cm/50-200 cm/over 200 cm) Notes : (multiple lines) Additional Information : Roof of Leeds University Mechanical Engineering Building DOMES number added 15/10/98 2. Site Location Information City or Town : Leeds State or Province : West Yorkshire Country : United Kingdom Tectonic Plate : Eurasian Approximate Position X coordinate (m) : 3773064.81 m Y coordinate (m) : -102444.82 m Z coordinate (m) : 5124374.40 m Latitude (deg) : 53.8094 N Longitude (deg) : 1.5553 W Elevation (m) : 161.7883 m Additional Information : (multiple lines) 3. Receiver Information 3.1 Receiver Type : ESA/ISN GNSS Satellite System : GPS+GLONASS Serial Number : 2 Firmware Version : Date Installed : (dd-MMM-yyyy hh:mm UT) Date Removed : (dd-MMM-yyyy hh:mm UT) Additional Information : (multiple lines) 3.x Receiver Type : Satellite System : (GPS/GLONASS/GPS+GLONASS) Serial Number : Firmware Version : Date Installed : (dd-MMM-yyyy hh:mm UT) Date Removed : (dd-MMM-yyyy hh:mm UT) Additional Information : (multiple lines) 4. Antenna Information 4.1 Antenna Type : Trimble: 4000SLD L1/L2 Serial Number : 2936A00162 Antenna Height (m) : 2.028(m) Antenna Reference Point : ARP Degree Offset from North : 0 Antenna Radome Type : Date Installed : (dd-MMM-yyyy hh:mm UT) Date Removed : (dd-MMM-yyyy hh:mm UT) Additional Information : Antenna height added 15/10/98 4.x Antenna Type : Serial Number : Antenna Height (m) : (m) Antenna Reference Point : (ARP/BCR/BPA) Degree Offset from North : Antenna Radome Type : Date Installed : (dd-MMM-yyyy hh:mm UT) Date Removed : (dd-MMM-yyyy hh:mm UT) Additional Information : (multiple lines) 5. Local Site Ties 5.x Monument Name : Site Ref CDP Number : (XXXX) Site Ref Domes Number : (XXXXXXXXX) Differential Components from GPS/GLONASS Marker to Site Reference (ITRS) dx (m) : (m) dy (m) : (m) dz (m) : (m) Accuracy (mm) : (mm) Date Measured : (dd-MMM-yyyy hh:mm UT) Additional Information : (multiple lines) 6. Frequency Standard 6.1 Standard Type : CESIUM Frequency : 10 MHz Effective Dates : 01-JAN-1993 - present Notes : Generates UTC(LDS) 6.x Standard Type : (H-MASER/CESIUM/QUARTZ/INTERNAL/RUBIDIUM) Frequency : Effective Dates : (dd-MMM-yyyy - dd-MMM-yyyy) Notes : (multiple lines) 7. Collocation Information 7.x Instrumentation Type : (GPS/GLONASS/DORIS/PRARE/SLR/VLBI) Status : (PERMANENT/MOBILE) Effective Dates : (dd-MMM-yyyy - dd-MMM-yyyy) Notes : (multiple lines) 8. Meteorological Instrumentation 8.1 Humidity Sensor Model : Manufacturer : Data Frequency : Accuracy (% rel h) : (% rel h) Effective Dates : (dd-MMM-yyyy - dd-MMM-yyyy) Notes : (multiple lines) 8.2 Pressure Sensor Model : Manufacturer : Data Frequency : Accuracy (mbar) : (mbar) Height Diff to Ant (m) : (m) Effective Dates : (dd-MMM-yyyy - dd-MMM-yyyy) Notes : (multiple lines) 8.3 Temperature Sensor Model : Manufacturer : Data Frequency : Accuracy (deg C) : (deg C) Effective Dates : (dd-MMM-yyyy - dd-MMM-yyyy) Notes : (multiple lines) 8.4 Water Vapor Radiometer : Manufacturer : Distance to Antenna (m): (m) Elev Diff to Ant (m) : (m) Effective Dates : (dd-MMM-yyyy - dd-MMM-yyyy) Notes : (multiple lines) 8.5 Other Instrumentation : (multiple lines) 9. On-Site, Point of Contact Agency Information Agency : CAA-Institute of Satellite Navigation Mailing Address : Leeds University, Woodhouse Lane, Leeds, LS2 9JT Primary Contact Contact Name : Dr Dave Lowe Telephone (primary) : +44 (0) 113 233 2079 Telephone (secondary) : +44 (0) 113 233 2025 Fax : +44 (0) 113 233 2032 E-mail : d.lowe@elec-eng.leeds.ac.uk Secondary Contact Contact Name : Mr Michael Daly Telephone (primary) : +44 (0) 113 233 2025 Telephone (secondary) : Fax : +44 (0) 113 233 2032 E-mail : michael@caaisn.leeds.ac.uk Additional Information : (multiple lines) 10. Responsible Agency (if different from 9.) Agency : (multiple lines) Mailing Address : (multiple lines) Primary Contact Contact Name : Telephone (primary) : Telephone (secondary) : Fax : E-mail : Secondary Contact Contact Name : Telephone (primary) : Telephone (secondary) : Fax : E-mail : Additional Information : (multiple lines) 11. More Information URL for More Information : Hardcopy on File Site Map : (Y) Site Diagram : (Y) Horizon Mask : (Y) Monument Description : (Y) Site Pictures : (Y) Additional Information : (multiple lines) Antenna Graphics with Dimensions Trimble: 4000SLD L1/L2 / \ / \ / + \ <-- 0.057 L1 / + \ <-- 0.056 L2 +-----------------+-----------------+------------------+ <-- 0.051 TGP +--------------+-----------------------+---------------+ <-- 0.050 BGP | | | | +-----------x-----------+ <-- 0.000 ARP=BPA <-- 0.198 --> <-- 0.483 --> 12. Local Events Possibly Affecting Computed Position 12.x Date : (dd-MMM-yyyy hh:mm UT) Event : (multiple lines)