CONX Site Information Form (site log) International GNSS Service See Instructions at: ftp://igscb.jpl.nasa.gov/pub/station/general/sitelog_instr.txt 0. Form Prepared by (full name) : Rudi Stoeger Date Prepared : 2015-04-07 Report Type : UPDATE If Update: Previous Site Log : conx_20130211.log Modified/Added Sections : 3.2, 4.1 1. Site Identification of the GNSS Monument Site Name : Concepcion - TIGO Four Character ID : CONX Monument Inscription : IERS DOMES Number : 41719M002 CDP Number : Monument Description : CONCRETE PILLAR STAINLESS STEAL CONSTRUCTION Height of the Monument : 2.0 m Monument Foundation : CONCRETE BLOCK Foundation Depth : 3.0 m Marker Description : 5/8" THREAD Date Installed : 2011-07-19T20:30Z Geologic Characteristic : CLAY Bedrock Type : Bedrock Condition : Fracture Spacing : Fault zones nearby : Distance/activity : Additional Information : The site is located in about 20km distance : to the pacific ocean and about 150km from : the nearest vulcanoes of the Andes. : CONX is connected to the antenna : of the CONZ GNSS Permanent Tracking : Station with an antenna splitter. : CONX and CONZ are using the same : antenna. 2. Site Location Information City or Town : Concepcion State or Province : VIII Region Country : Chile Tectonic Plate : SOUTH AMERICAN Approximate Position (ITRF) X coordinate (m) : 1492007.790 Y coordinate (m) : -4887911.140 Z coordinate (m) : -3803640.120 Latitude (N is +) : -365037.54 Longitude (E is +) : -0730131.73 Elevation (m,ellips.) : 00181.2 Additional Information : The site is at the TIGO observatory at the : campus of the Universidad de Concepcion. 3. GNSS Receiver Information 3.1 Receiver Type : JAVAD TRE_G3TH DELTA Satellite System : GPS+GLO+GAL+SBAS Serial Number : 014HTEWX8LL3R1MM4KLP Firmware Version : 3.1.7 MAY,31,2010 Elevation Cutoff Setting : 0 deg Date Installed : 2011-07-19T20:30Z Date Removed : 2012-12-27T11:30Z Temperature Stabiliz. : 2.0 Additional Information : Full Receiver ID : Serial Number is : 014HTEWX8LL3R1MM4KLPU3W13B. : Additional Number : SN 00434 on the type level. : Do not use data files prior : 2011-07-19, because : another antenna was used : about 25 cm away. 3.2 Receiver Type : JAVAD TRE_G3TH DELTA Satellite System : GPS+GLO+GAL+SBAS Serial Number : 014HTEWX8LL3R1MM4KLP Firmware Version : 3.4.7 DEC,26,2012 Elevation Cutoff Setting : 0 deg Date Installed : 2012-12-27T11:31Z Date Removed : 2015-04-06T21:10Z Temperature Stabiliz. : 2.0 Additional Information : Full Receiver ID : Serial Number is : 014HTEWX8LL3R1MM4KLPU3W13B. : Additional Number : SN 00434 on the type level. 3.x Receiver Type : (A20, from rcvr_ant.tab; see instructions) Satellite System : (GPS+GLO+GAL+BDS+QZSS+SBAS) Serial Number : (A20, but note the first A5 is used in SINEX) Firmware Version : (A11) Elevation Cutoff Setting : (deg) Date Installed : (CCYY-MM-DDThh:mmZ) Date Removed : (CCYY-MM-DDThh:mmZ) Temperature Stabiliz. : (none or tolerance in degrees C) Additional Information : (multiple lines) 4. GNSS Antenna Information 4.1 Antenna Type : LEIAR25.R3 LEIT Serial Number : 10020007 Antenna Reference Point : BPA Marker->ARP Up Ecc. (m) : 000.0574 Marker->ARP North Ecc(m) : 000.0000 Marker->ARP East Ecc(m) : 000.0000 Alignment from True N : 0 deg Antenna Radome Type : LEIT Radome Serial Number : Antenna Cable Type : Nokia Cable M17/75-RG214 Antenna Cable Length : 60 m Date Installed : 2011-07-19T20:30Z Date Removed : 2015-04-06T21:10Z Additional Information : Antenna and radome calibrated : by Geo+++ GmbH Garbsen, 2010-04-28. 4.x Antenna Type : (A20, from rcvr_ant.tab; see instructions) Serial Number : (A*, but note the first A5 is used in SINEX) Antenna Reference Point : (BPA/BCR/XXX from "antenna.gra"; see instr.) Marker->ARP Up Ecc. (m) : (F8.4) Marker->ARP North Ecc(m) : (F8.4) Marker->ARP East Ecc(m) : (F8.4) Alignment from True N : (deg; + is clockwise/east) Antenna Radome Type : (A4 from rcvr_ant.tab; see instructions) Radome Serial Number : Antenna Cable Type : (vendor & type number) Antenna Cable Length : (m) Date Installed : (CCYY-MM-DDThh:mmZ) Date Removed : (CCYY-MM-DDThh:mmZ) Additional Information : (multiple lines) 5. Surveyed Local Ties 5.1 Tied Marker Name : T100 Tied Marker Usage : VLBI Tied Marker CDP Number : 7640 Tied Marker DOMES Number : 41719S001 Differential Components from GNSS Marker to the tied monument (ITRS) dx (m) : dy (m) : dz (m) : Accuracy (mm) : Survey method : Date Measured : (CCYY-MM-DDThh:mmZ) Additional Information : 5.2 Tied Marker Name : T200 Tied Marker Usage : SLR Tied Marker CDP Number : 7405 Tied Marker DOMES Number : 41719M001 Differential Components from GNSS Marker to the tied monument (ITRS) dx (m) : dy (m) : dz (m) : Accuracy (mm) : Survey method : Date Measured : (CCYY-MM-DDThh:mmZ) Additional Information : 5.x Tied Marker Name : Tied Marker Usage : (SLR/VLBI/LOCAL CONTROL/FOOTPRINT/etc) Tied Marker CDP Number : (A4) Tied Marker DOMES Number : (A9) Differential Components from GNSS Marker to the tied monument (ITRS) dx (m) : (m) dy (m) : (m) dz (m) : (m) Accuracy (mm) : (mm) Survey method : (GPS CAMPAIGN/TRILATERATION/TRIANGULATION/etc) Date Measured : (CCYY-MM-DDThh:mmZ) Additional Information : (multiple lines) Section 6.7. Collocation Information 7.1 Instrumentation Type : VLBI Status : PERMANENT Effective Dates : 2002-04-23/CCYY-MM-DD Notes : 7.2 Instrumentation Type : SLR Status : MOBILE Effective Dates : 2002-05-01/CCYY-MM-DD Notes : 7.3 Instrumentation Type : PRARE Status : PERMANENT Effective Dates : 2002-06-15/CCYY-MM-DD Notes : 7.4 Instrumentation Type : JPS LEGACY GPS+GLONASS CONZ Status : PERMANENT Effective Dates : 2002-05-16/2006-06-22 Notes : Four character ID CONZ 7.5 Instrumentation Type : TPS E_GGD GPS+GLONASS CONZ Status : PERMANENT Effective Dates : 2006-06-22/2009-04-30 Notes : Four character ID CONZ 7.6 Instrumentation Type : LEICA GRX1200GGPRO GPS+GLONASS CONZ Status : PERMANENT Effective Dates : 2009-04-30/CCYY-MM-DD Notes : Four character ID CONZ 7.7 Instrumentation Type : Supra Conducting Gravitymeter Status : PERMANENT Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Notes : 7.8 Instrumentation Type : SEPT POLARX2 GPS+SBAS CONT Status : PERMANENT Effective Dates : 2005-08-17/CCYY-MM-DD Notes : 7.x Instrumentation Type : (GPS/GLONASS/DORIS/PRARE/SLR/VLBI/TIME/etc) Status : (PERMANENT/MOBILE) Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Notes : (multiple lines) 8. Meteorological Instrumentation 8.1.1 Humidity Sensor Model : 809 L 0-100 Manufacturer : Lambrecht Serial Number : Data Sampling Interval : 60 sec Accuracy (% rel h) : 2.5 Aspiration : PERNIX Height Diff to Ant : 10 m Calibration date : (CCYY-MM-DD) Effective Dates : 2002-04-01/CCYY-MM-DD Notes : The humidity sensor is about 10 m below : GPS monument in 50 m distance. : Humidity Sensor data see at the : meteorological data file for the : CONZ GNSS Permanent Tracking Station. 8.1.x Humidity Sensor Model : Manufacturer : Serial Number : Data Sampling Interval : (sec) Accuracy (% rel h) : (% rel h) Aspiration : (UNASPIRATED/NATURAL/FAN/etc) Height Diff to Ant : (m) Calibration date : (CCYY-MM-DD) Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Notes : (multiple lines) 8.2.1 Pressure Sensor Model : 740-16B DIGIQUARTZ Manufacturer : PAROSCIENTIFIC Serial Number : Data Sampling Interval : 60 sec Accuracy : 0.1 hPa Height Diff to Ant : 15 m Calibration date : (CCYY-MM-DD) Effective Dates : 2002-04-01/CCYY-MM-DD Notes : The pressure sensor is located inside : TIGO-3 and about 15 m below GPS antenna. : Pressure Sensor data see at the : meteorological data file for the : CONZ GNSS Permanent Tracking Station. 8.2.x Pressure Sensor Model : Manufacturer : Serial Number : Data Sampling Interval : (sec) Accuracy : (hPa) Height Diff to Ant : (m) Calibration date : (CCYY-MM-DD) Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Notes : (multiple lines) 8.3.1 Temp. Sensor Model : 809 L 0-100 Manufacturer : Lambrecht Serial Number : Data Sampling Interval : 60 sec Accuracy : 0.3 deg C Aspiration : PLATINUM PROBE Height Diff to Ant : 10 m Calibration date : Effective Dates : 2002-04-01/CCYY-MM-DD Notes : The temperature sensor is about 10 m below : the GPS-antenna in about 50 m distance. : Temperature Sensor data see at the : meteorological data file for the : CONZ GNSS Permanent Tracking Station. 8.3.x Temp. Sensor Model : Manufacturer : Serial Number : Data Sampling Interval : (sec) Accuracy : (deg C) Aspiration : (UNASPIRATED/NATURAL/FAN/etc) Height Diff to Ant : (m) Calibration date : (CCYY-MM-DD) Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Notes : (multiple lines) 8.4.x Water Vapor Radiometer : Manufacturer : Serial Number : Distance to Antenna : (m) Height Diff to Ant : (m) Calibration date : (CCYY-MM-DD) Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Notes : (multiple lines) 8.5.1 Other Instrumentation : Tiltmeter inside the GPS-monument 8.5.2 Other Instrumentation : Broadband Seismometer 8.5.x Other Instrumentation : (multiple lines) 9. Local Ongoing Conditions Possibly Affecting Computed Position 9.1.x Radio Interferences : (TV/CELL PHONE ANTENNA/RADAR/etc) Observed Degradations : (SN RATIO/DATA GAPS/etc) Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Additional Information : (multiple lines) 9.2.x Multipath Sources : (METAL ROOF/DOME/VLBI ANTENNA/etc) Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Additional Information : (multiple lines) 9.3.x Signal Obstructions : (TREES/BUILDINGS/etc) Effective Dates : (CCYY-MM-DD/CCYY-MM-DD) Additional Information : (multiple lines) 10. Local Episodic Effects Possibly Affecting Data Quality 10.x Date : (CCYY-MM-DD/CCYY-MM-DD) Event : (TREE CLEARING/CONSTRUCTION/etc) 11. On-Site, Point of Contact Agency Information Agency : Universidad de Concepcion Preferred Abbreviation : UdeC Mailing Address : Universidad de Concepcion : Proyecto TIGO : Casilla 4036, Correo 3 : Concepcion : CHILE Primary Contact Contact Name : Armin Boer Telephone (primary) : ++49-9941-603204 Telephone (secondary) : ++49-9941-6030 Fax : ++49-9941-603222 E-mail : armin.boer@bkg.bund.de Secondary Contact Contact Name : Hayo Hase Telephone (primary) : +56-41-2207032 Telephone (secondary) : +56-41-2207051 Fax : +56-41-2207031 E-mail : hayo.hase@tigo.cl Additional Information : 12. Responsible Agency (if different from 11.) Agency : Bundesamt für Kartographie : und Geodäsie Preferred Abbreviation : BKG Mailing Address : Bundesamt fuer Kartographie : und Geodeasie : Geodetical Observatory Wettzell : Sackenrieder Str. 25 : D-93444 Bad Koetzting : GERMANY Primary Contact Contact Name : Reiner Dassing Telephone (primary) : ++49-9941-603112 Telephone (secondary) : ++49-9941-6030 Fax : ++49-9941-603222 E-mail : reiner.dassing@bkg.bund.de Secondary Contact Contact Name : Uwe Hessels Telephone (primary) : ++49-9941-603208 Telephone (secondary) : ++49-9941-6030 Fax : ++49-9941-603222 E-mail : uwe.hessels@bkg.bund.de Additional Information : Klaus Roettcher : ++49-9941-603115 : klaus.roettcher@bkg.bund.de : Rudi Stoeger : ++49-9941603117 : ++49-99416030 : ++49-9941603222 : rudolf.stoeger@bkg.bund.de 13. More Information Primary Data Center : BKG Secondary Data Center : OLG URL for More Information : www.tigo.cl, www.fs.wettzell.de Hardcopy on File Site Map : Site Diagram : Horizon Mask : Monument Description : Site Pictures : Y Additional Information : Antenna Graphics with Dimensions LEIAR25.R3 +-------+ <-- 0.1995 / +---+-------------+---+ <-- 0.1606 TCR | | |---------------------------| |---------------------------------| |---------------------------------------| +---------------------------------------------+ | | | | +-+---------------------------------------------+-+ +-----------------+-------------+-----------------+ <-- 0.0320 BCR | | | | +------x------+ <-- 0.0000 BPA=ARP <-- 0.3802 --> ARP: Antenna Reference Point L1 : L1 Phase Center L2 : L2 Phase Center TCR: Top of Chokering BCR: Bottom of Chokering TGP: Top of Ground Plane BGP: Bottom of Ground Plane TPA: Top of Preamplifier BPA: Bottom of Preamplifier TOP: Top of Pole