Remarks Concerning the Orbit Comparisons
________________________________________

In the following four IGS reports (including this one) you will find
orbit comparisons for GPS weeks 660 - 667 performed by our Analysis
Center Coordinator Clyde Goad.  They are quite voluminous but - I
believe - most informative.  In future there will be the possibility
to condense this information (weekly averages with associated rms
errors).  On the other hand it is most important (at least for the
processing centers) to have the full information for a number of weeks
at hand.  This issue may be discussed next week at the San Francisco
oversight committee business meeting.

When browsing through the orbit comparisons it is evident that at
CDDIS not all orbits produced by the processing centers are actually
available at CDDIS (they should be available at all three network
centers). Let me urge all processing centers contributing to the IGS
Pilot Service to make sure that their products are available in time
for future orbit comparisons !

It took some time to make these comparisons.  They reflect essentially
what was available at CDDIS October/beginning of November.  The latest
changes (e.g. the newly produced UTX orbits) could not be included.

Kind regards

Gerhard Beutler


ORBIT COMPARISON FOR DAY 1 OF GPS WEEK 660 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48864              30      8     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
 0.125 0.078 0.077   1.5  -0.9  -1.5  -0.0006  0.71  cod0660-->esa0660          
 0.057 0.020-0.037   0.6  -0.6  -1.1  -0.0008  0.49  cod0660-->emr0660          
 0.093 0.051-0.107   0.0   1.1  -3.7  -0.0004  0.50  cod0660-->utx0660          
 0.017 0.052 0.004  -2.6 -11.2  13.8  -0.0002  0.54  cod0660-->sio0660          
-0.015-0.038-0.067  -0.9  -1.1   0.6  -0.0040  0.81  cod0660-->gfz0660          
 0.051 0.042-0.079   0.8   0.0  -0.7  -0.0354  0.47  cod0660-->jpl0660          
                                                                                
-0.068-0.058-0.113  -0.9   0.3   0.4  -0.0002  0.56  esa0660-->emr0660          
-0.032-0.027-0.184  -1.6   2.0  -2.2   0.0002  0.56  esa0660-->utx0660          
-0.107-0.027-0.068  -4.1 -10.3  15.3   0.0005  0.76  esa0660-->sio0660          
-0.140-0.116-0.144  -2.4  -0.2   2.2  -0.0034  0.87  esa0660-->gfz0660          
-0.073-0.055-0.164  -0.8   0.9   0.4  -0.0347  0.55  esa0660-->jpl0660          
                                                                                
 0.036 0.030-0.071  -0.6   1.7  -2.6   0.0004  0.37  emr0660-->utx0660          
-0.040 0.032 0.043  -3.2 -10.7  14.9   0.0005  0.53  emr0660-->sio0660          
-0.072-0.058-0.030  -1.5  -0.5   1.7  -0.0032  0.78  emr0660-->gfz0660          
-0.007 0.024-0.053   0.2   0.5   0.4  -0.0343  0.31  emr0660-->jpl0660          
                                                                                
-0.073 0.002 0.113  -2.6 -12.3  17.5   0.0002  0.51  utx0660-->sio0660          
-0.108-0.088 0.041  -0.9  -2.2   4.3  -0.0036  0.76  utx0660-->gfz0660          
-0.044 0.001 0.029   1.0  -1.1   3.1  -0.0346  0.41  utx0660-->jpl0660          
                                                                                
-0.047-0.092-0.085   1.5  10.4 -13.1  -0.0046  0.81  sio0660-->gfz0660          
 0.042 0.005-0.087   3.8  11.3 -14.0  -0.0348  0.51  sio0660-->jpl0660          
                                                                                
 0.075 0.100-0.004   1.9   1.1  -1.5  -0.0306  0.75  gfz0660-->jpl0660          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 2 OF GPS WEEK 660 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48865              31      8     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
 0.051 0.021 0.116   0.7  -1.5  -2.3  -0.0006  0.66  cod0660-->esa0660          
 0.069 0.030-0.032  -1.3  -1.4  -1.8  -0.0007  0.47  cod0660-->emr0660          
 0.061-0.008-0.045   0.0  -0.3  -4.6  -0.0006  0.41  cod0660-->utx0660          
 0.036 0.061 0.016  -2.8 -11.9  12.4  -0.0005  0.47  cod0660-->sio0660          
-0.046 0.029-0.011  -2.3  -1.6   0.0  -0.0044  0.85  cod0660-->gfz0660          
 0.048 0.039-0.008   0.0  -0.7  -1.6  -0.0349  0.42  cod0660-->jpl0660          
                                                                                
 0.018 0.009-0.149  -2.0   0.1   0.5  -0.0001  0.50  esa0660-->emr0660          
 0.010-0.029-0.162  -0.7   1.2  -2.3   0.0000  0.52  esa0660-->utx0660          
-0.015 0.040-0.101  -3.5 -10.4  14.6   0.0001  0.68  esa0660-->sio0660          
-0.097 0.008-0.128  -3.0  -0.1   2.3  -0.0038  0.85  esa0660-->gfz0660          
-0.004 0.018-0.125  -0.7   0.8   0.7  -0.0343  0.50  esa0660-->jpl0660          
                                                                                
-0.008-0.038-0.013   1.2   1.1  -2.8   0.0000  0.31  emr0660-->utx0660          
-0.036 0.033 0.046  -1.6 -10.6  14.1   0.0002  0.52  emr0660-->sio0660          
-0.115-0.001 0.021  -1.0  -0.2   1.8  -0.0038  0.80  emr0660-->gfz0660          
-0.022 0.010 0.023   1.3   0.7   0.2  -0.0343  0.33  emr0660-->jpl0660          
                                                                                
-0.026 0.070 0.059  -2.8 -11.6  16.9   0.0001  0.46  utx0660-->sio0660          
-0.107 0.037 0.034  -2.2  -1.2   4.6  -0.0038  0.81  utx0660-->gfz0660          
-0.014 0.048 0.036   0.0  -0.4   3.0  -0.0343  0.32  utx0660-->jpl0660          
                                                                                
-0.092-0.027-0.011   0.7  10.2 -12.3  -0.0037  0.85  sio0660-->gfz0660          
 0.012-0.023-0.025   2.9  11.2 -13.9  -0.0344  0.47  sio0660-->jpl0660          
                                                                                
 0.094 0.012 0.002   2.3   0.9  -1.7  -0.0305  0.79  gfz0660-->jpl0660          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 3 OF GPS WEEK 660 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48866               1      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
 0.161 0.101 0.090   1.2  -0.7  -0.7  -0.0005  0.54  cod0660-->esa0660          
 0.102 0.053-0.024  -1.4  -1.9   0.0  -0.0005  0.44  cod0660-->emr0660          
 0.109-0.012-0.053  -0.4   0.2  -2.6  -0.0003  0.36  cod0660-->utx0660          
 0.058 0.041-0.021  -2.5 -13.4  13.8  -0.0006  0.45  cod0660-->sio0660          
-0.020 0.026-0.085  -2.1  -3.5   1.2  -0.0037  0.78  cod0660-->gfz0660          
 0.063 0.040-0.041  -0.2  -1.1   0.0  -0.0349  0.38  cod0660-->jpl0660          
                                                                                
-0.055-0.048-0.114  -2.7  -1.2   0.7  -0.0001  0.55  esa0660-->emr0660          
-0.045-0.111-0.142  -1.7   0.9  -1.9   0.0001  0.52  esa0660-->utx0660          
-0.100-0.058-0.112  -3.8 -12.7  14.4  -0.0001  0.65  esa0660-->sio0660          
-0.174-0.073-0.171  -3.4  -2.7   1.8  -0.0032  0.87  esa0660-->gfz0660          
-0.095-0.060-0.130  -1.5  -0.3   0.7  -0.0345  0.51  esa0660-->jpl0660          
                                                                                
 0.009-0.063-0.028   1.0   2.1  -2.6   0.0003  0.36  emr0660-->utx0660          
-0.045-0.007 0.001  -1.2 -11.6  13.7   0.0000  0.48  emr0660-->sio0660          
-0.119-0.025-0.058  -0.7  -1.6   1.1  -0.0031  0.78  emr0660-->gfz0660          
-0.041-0.011-0.016   1.2   0.8   0.0  -0.0344  0.35  emr0660-->jpl0660          
                                                                                
-0.050 0.054 0.030  -2.1 -13.6  16.3  -0.0003  0.46  utx0660-->sio0660          
-0.129 0.038-0.029  -1.7  -3.6   3.7  -0.0033  0.78  utx0660-->gfz0660          
-0.050 0.052 0.012   0.2  -1.3   2.6  -0.0346  0.36  utx0660-->jpl0660          
                                                                                
-0.074-0.040-0.110   0.6  10.1 -12.5  -0.0039  0.79  sio0660-->gfz0660          
 0.002-0.003-0.019   2.3  12.4 -13.8  -0.0343  0.45  sio0660-->jpl0660          
                                                                                
 0.077 0.014 0.041   1.9   2.4  -1.2  -0.0313  0.74  gfz0660-->jpl0660          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 4 OF GPS WEEK 660 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48867               2      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
                                                                                
-0.058-0.045-0.214  -1.9   2.0   0.4  -0.0001  0.53  esa0660-->emr0660          
-0.047-0.073-0.172  -2.5   1.9  -2.6  -0.0001  0.58  esa0660-->utx0660          
-0.089-0.037-0.123  -4.2 -11.7  13.8  -0.0011  0.61  esa0660-->sio0660          
-0.105-0.048-0.191  -2.8  -0.2   1.5  -0.0035  0.82  esa0660-->gfz0660          
-0.068-0.030-0.228  -1.0   1.5   0.5  -0.0346  0.53  esa0660-->jpl0660          
                                                                                
 0.011-0.028 0.043  -0.7  -0.1  -3.0   0.0000  0.39  emr0660-->utx0660          
-0.030 0.005 0.089  -2.4 -13.7  13.5  -0.0010  0.43  emr0660-->sio0660          
-0.047-0.004 0.023  -1.0  -2.1   1.1  -0.0034  0.71  emr0660-->gfz0660          
-0.010 0.015-0.014   0.8  -0.5   0.1  -0.0345  0.30  emr0660-->jpl0660          
                                                                                
-0.036 0.032 0.047  -1.6 -13.6  16.4  -0.0011  0.37  utx0660-->sio0660          
-0.058 0.024-0.020  -0.3  -2.0   4.1  -0.0034  0.75  utx0660-->gfz0660          
-0.021 0.043-0.057   1.5  -0.4   3.1  -0.0345  0.39  utx0660-->jpl0660          
                                                                                
-0.022-0.035-0.114   1.2  11.5 -12.5  -0.0026  0.79  sio0660-->gfz0660          
 0.018 0.010-0.105   3.2  13.2 -13.3  -0.0335  0.41  sio0660-->jpl0660          
                                                                                
 0.037 0.018-0.037   1.8   1.6  -1.0  -0.0310  0.69  gfz0660-->jpl0660          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 5 OF GPS WEEK 660 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48868               3      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
                                                                                
-0.015 0.000-0.189  -3.3  -1.0   0.3  -0.0002  0.52  esa0660-->emr0660          
-0.027-0.024-0.133  -2.7   0.5  -2.4   0.0002  0.50  esa0660-->utx0660          
-0.021 0.001-0.055  -6.3 -12.7  13.0  -0.0004  0.61  esa0660-->sio0660          
-0.077-0.023-0.200  -3.7  -1.2   2.2  -0.0036  0.84  esa0660-->gfz0660          
-0.025-0.021-0.169  -1.6   0.0   0.7  -0.0344  0.51  esa0660-->jpl0660          
                                                                                
-0.012-0.024 0.056   0.6   1.5  -2.7   0.0005  0.34  emr0660-->utx0660          
-0.003-0.002 0.134  -3.0 -11.8  12.7  -0.0002  0.52  emr0660-->sio0660          
-0.062-0.024-0.011  -0.4  -0.2   1.8  -0.0034  0.70  emr0660-->gfz0660          
-0.010-0.021 0.019   1.7   1.0   0.4  -0.0342  0.27  emr0660-->jpl0660          
                                                                                
 0.009 0.023 0.078  -3.6 -13.3  15.5  -0.0007  0.52  utx0660-->sio0660          
-0.050 0.001-0.067  -1.0  -1.7   4.6  -0.0039  0.74  utx0660-->gfz0660          
 0.002 0.003-0.037   1.1  -0.5   3.2  -0.0347  0.34  utx0660-->jpl0660          
                                                                                
-0.044-0.017-0.159   2.6  11.6 -11.0  -0.0020  0.85  sio0660-->gfz0660          
-0.008-0.021-0.116   4.7  12.8 -12.3  -0.0340  0.53  sio0660-->jpl0660          
                                                                                
 0.052 0.002 0.030   2.1   1.2  -1.4  -0.0308  0.69  gfz0660-->jpl0660          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 6 OF GPS WEEK 660 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48869               4      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
                                                                                
 0.097-0.062-0.092  -2.3  -2.0   1.3   0.0006  0.70  esa0660-->emr0660          
 0.012-0.034-0.145  -1.6   0.5  -1.5   0.0001  0.52  esa0660-->utx0660          
 0.045-0.007-0.092  -2.6   0.3  14.0  -0.0005  0.59  esa0660-->sio0660          
-0.033-0.032-0.198  -3.0  -2.3   1.7  -0.0039  0.85  esa0660-->gfz0660          
 0.035-0.001-0.159  -1.2  -0.1   1.5  -0.0345  0.52  esa0660-->jpl0660          
                                                                                
-0.086 0.026-0.051   0.7   2.5  -2.8  -0.0004  0.50  emr0660-->utx0660          
-0.054 0.055-0.003  -0.3   2.2  12.8  -0.0010  0.55  emr0660-->sio0660          
-0.130 0.029-0.104  -0.6  -0.3   0.4  -0.0044  0.80  emr0660-->gfz0660          
-0.061 0.060-0.066   1.1   1.9   0.2  -0.0350  0.50  emr0660-->jpl0660          
                                                                                
 0.037 0.027 0.051  -1.0  -0.2  15.6  -0.0007  0.35  utx0660-->sio0660          
-0.046 0.002-0.053  -1.4  -2.8   3.2  -0.0041  0.70  utx0660-->gfz0660          
 0.022 0.033-0.014   0.4  -0.6   3.1  -0.0346  0.29  utx0660-->jpl0660          
                                                                                
-0.065-0.068-0.074  -0.6  -2.2 -12.3  -0.0028  0.73  sio0660-->gfz0660          
-0.012 0.005-0.068   1.4  -0.4 -12.5  -0.0339  0.39  sio0660-->jpl0660          
                                                                                
 0.068 0.031 0.039   1.7   2.1  -0.2  -0.0305  0.67  gfz0660-->jpl0660          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 7 OF GPS WEEK 660 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48870               5      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
                                                                                
-0.046-0.049-0.199  -1.7   0.0  -2.9   0.0007  0.65  esa0660-->utx0660          
-0.075 0.038-0.243  -2.2  -0.7  12.6   0.0008  0.88  esa0660-->sio0660          
-0.099-0.048-0.156  -2.6  -2.2   0.4  -0.0024  1.03  esa0660-->gfz0660          
-0.060-0.024-0.186  -1.3  -0.6   0.4  -0.0338  0.71  esa0660-->jpl0660          
                                                                                
                                                                                
-0.029 0.087-0.042  -0.5  -0.7  15.6   0.0001  0.48  utx0660-->sio0660          
-0.053 0.001 0.043  -0.8  -2.2   3.3  -0.0031  0.84  utx0660-->gfz0660          
-0.014 0.025 0.013   0.5  -0.6   3.3  -0.0345  0.33  utx0660-->jpl0660          
                                                                                
-0.003-0.061 0.076  -0.3  -1.3 -12.4  -0.0035  1.02  sio0660-->gfz0660          
 0.013-0.062 0.054   1.0   0.1 -12.3  -0.0346  0.48  sio0660-->jpl0660          
                                                                                
 0.039 0.024-0.030   1.3   1.6   0.0  -0.0313  0.81  gfz0660-->jpl0660          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 1 OF GPS WEEK 661 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48871               6      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
-0.012-0.042 0.026   1.1  -0.8  -1.3  -0.0009  0.60  cod0661-->esa0661          
 0.009-0.145 0.154  -0.1   1.5  -4.0  -0.0028  0.82  cod0661-->utx0661          
 0.071-0.033 0.169  -0.2   0.3  12.5  -0.0007  0.66  cod0661-->sio0661          
-0.070-0.132 0.048  -1.0  -1.9   0.7  -0.0053  0.88  cod0661-->gfz0661          
 0.058-0.153 0.001   0.7  -0.5  -1.1  -0.0353  0.56  cod0661-->jpl0661          
                                                                                
 0.021-0.102 0.129  -1.2   2.3  -2.7  -0.0019  0.75  esa0661-->utx0661          
 0.084 0.010 0.145  -1.2   1.0  13.8   0.0002  0.74  esa0661-->sio0661          
-0.058-0.089 0.023  -2.1  -1.1   2.0  -0.0044  0.92  esa0661-->gfz0661          
 0.069-0.111-0.026  -0.4   0.3   0.1  -0.0343  0.63  esa0661-->jpl0661          
                                                                                
                                                                                
 0.060 0.110 0.015  -0.1  -1.3  16.5   0.0022  0.63  utx0661-->sio0661          
-0.079 0.013-0.106  -0.9  -3.5   4.7  -0.0025  0.96  utx0661-->gfz0661          
 0.051-0.004-0.153   0.9  -2.1   2.8  -0.0325  0.71  utx0661-->jpl0661          
                                                                                
-0.171-0.044-0.095  -0.8  -2.3 -11.7  -0.0038  0.89  sio0661-->gfz0661          
-0.016-0.117-0.165   1.2  -0.7 -13.6  -0.0346  0.56  sio0661-->jpl0661          
                                                                                
 0.128-0.021-0.043   1.7   1.4  -1.8  -0.0300  0.77  gfz0661-->jpl0661          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 2 OF GPS WEEK 661 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48872               7      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
-0.010 0.064 0.166  -1.3   0.0  -0.6  -0.0011  0.75  cod0661-->esa0661          
 0.038-0.036 0.014  -1.9  -0.8  -1.0   0.0002  0.54  cod0661-->emr0661          
-0.017-0.111 0.017   1.3   2.5  -3.2  -0.0013  0.61  cod0661-->utx0661          
 0.019-0.046 0.031   0.1  -0.3  12.8  -0.0008  0.53  cod0661-->sio0661          
-0.011-0.068-0.061  -1.6  -2.0   0.4  -0.0035  0.82  cod0661-->gfz0661          
-0.006-0.098-0.085   0.9  -0.2  -0.4  -0.0354  0.43  cod0661-->jpl0661          
                                                                                
 0.048-0.097-0.149  -0.7  -0.8  -0.3   0.0012  0.79  esa0661-->emr0661          
-0.007-0.174-0.149   2.6   2.5  -2.6  -0.0002  0.81  esa0661-->utx0661          
 0.028-0.111-0.138   1.4  -0.3  13.3   0.0003  0.78  esa0661-->sio0661          
-0.001-0.132-0.227  -0.3  -2.0   1.0  -0.0024  1.05  esa0661-->gfz0661          
 0.003-0.150-0.228   2.2  -0.2  -0.3  -0.0345  0.72  esa0661-->jpl0661          
                                                                                
-0.054-0.076 0.004   3.2   3.3  -2.2  -0.0015  0.51  emr0661-->utx0661          
-0.016-0.008 0.019   2.0   0.4  13.7  -0.0010  0.41  emr0661-->sio0661          
-0.049-0.033-0.074   0.3  -1.2   1.4  -0.0037  0.73  emr0661-->gfz0661          
-0.040-0.115-0.092   2.4   0.4   1.2  -0.0352  0.32  emr0661-->jpl0661          
                                                                                
 0.043 0.066 0.010  -1.3  -2.8  15.9   0.0006  0.54  utx0661-->sio0661          
 0.005 0.042-0.078  -3.0  -4.5   3.6  -0.0022  0.86  utx0661-->gfz0661          
 0.028-0.013-0.092  -0.8  -2.8   3.4  -0.0336  0.54  utx0661-->jpl0661          
                                                                                
-0.044 0.001-0.076  -1.4  -1.8 -12.3  -0.0036  0.78  sio0661-->gfz0661          
-0.013-0.088-0.102   0.6   0.1 -12.5  -0.0343  0.41  sio0661-->jpl0661          
                                                                                
 0.017-0.085 0.000   2.1   1.6   0.2  -0.0314  0.74  gfz0661-->jpl0661          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 3 OF GPS WEEK 661 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48873               8      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
-0.008 0.170 0.071   0.2   2.0   0.8   0.0016  1.56  cod0661-->esa0661          
 0.000-0.005 0.009  -0.6   1.1  -1.2   0.0004  0.57  cod0661-->emr0661          
-0.079-0.020 0.008   3.1   2.0  -3.6  -0.0009  0.73  cod0661-->utx0661          
 0.053-0.015 0.053   0.7   0.2  12.7  -0.0013  0.61  cod0661-->sio0661          
-0.157 0.029-0.238  -1.5  -0.7  -0.6  -0.0021  1.24  cod0661-->gfz0661          
-0.012-0.060-0.088   0.5   0.2  -1.4  -0.0356  0.54  cod0661-->jpl0661          
                                                                                
 0.023-0.175-0.093  -1.2  -0.9  -2.2  -0.0014  1.54  esa0661-->emr0661          
-0.049-0.192-0.105   2.4   0.1  -4.7  -0.0028  1.48  esa0661-->utx0661          
 0.055-0.182-0.004   0.6  -1.7  11.9  -0.0027  1.59  esa0661-->sio0661          
-0.374 0.087-0.165   1.5  -0.9   0.5  -0.0023  1.93  esa0661-->gfz0661          
-0.011-0.265-0.094   0.4  -2.0  -2.3  -0.0370  1.54  esa0661-->jpl0661          
                                                                                
-0.079-0.015-0.001   3.8   0.9  -2.4  -0.0013  0.58  emr0661-->utx0661          
 0.054-0.011 0.043   1.3  -0.9  13.9  -0.0017  0.48  emr0661-->sio0661          
-0.185 0.049-0.241  -0.6  -1.6   0.8  -0.0021  1.18  emr0661-->gfz0661          
-0.003-0.094-0.072   0.8  -1.1   0.6  -0.0358  0.46  emr0661-->jpl0661          
                                                                                
 0.135 0.005 0.046  -2.5  -1.8  16.3  -0.0004  0.72  utx0661-->sio0661          
-0.125 0.094-0.237  -4.1  -2.4   3.4  -0.0007  1.31  utx0661-->gfz0661          
 0.089-0.072-0.082  -3.0  -2.0   2.9  -0.0344  0.69  utx0661-->jpl0661          
                                                                                
-0.223 0.038-0.309  -2.2  -1.1 -13.4  -0.0004  1.11  sio0661-->gfz0661          
-0.056-0.075-0.118  -0.3  -0.1 -12.9  -0.0341  0.48  sio0661-->jpl0661          
                                                                                
 0.157-0.153 0.209   1.8   0.7   0.6  -0.0330  1.16  gfz0661-->jpl0661          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 4 OF GPS WEEK 661 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48874               9      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
 0.031 0.024-0.021   0.6  -1.3  -2.1  -0.0007  0.81  cod0661-->esa0661          
 0.045 0.016-0.074  -2.2   1.0  -1.5  -0.0003  0.61  cod0661-->emr0661          
-0.005-0.038-0.032   1.1   1.6  -4.8  -0.0008  0.68  cod0661-->utx0661          
 0.022-0.021 0.066   0.5   0.0  12.6  -0.0007  0.61  cod0661-->sio0661          
-0.036-0.014-0.075  -1.4  -1.4  -0.3  -0.0059  0.91  cod0661-->gfz0661          
-0.003-0.120-0.108   0.3  -0.2   0.2  -0.0349  0.55  cod0661-->jpl0661          
                                                                                
 0.016-0.008-0.056  -2.8   2.3   0.5   0.0003  0.73  esa0661-->emr0661          
-0.036-0.063-0.014   0.5   2.9  -2.7  -0.0002  0.83  esa0661-->utx0661          
-0.009-0.048 0.087  -0.1   1.3  14.6   0.0000  0.81  esa0661-->sio0661          
-0.093-0.035-0.057  -1.8  -0.1   1.5  -0.0051  0.99  esa0661-->gfz0661          
-0.040-0.155-0.098  -0.3   1.1   1.3  -0.0346  0.75  esa0661-->jpl0661          
                                                                                
-0.052-0.055 0.042   3.3   0.6  -3.3  -0.0005  0.52  emr0661-->utx0661          
-0.025-0.037 0.141   2.7  -1.0  14.1  -0.0004  0.42  emr0661-->sio0661          
-0.081-0.025-0.008   0.7  -2.4   1.0  -0.0056  0.74  emr0661-->gfz0661          
-0.053-0.147-0.049   2.6  -1.2   0.9  -0.0347  0.34  emr0661-->jpl0661          
                                                                                
 0.029 0.015 0.098  -0.6  -1.6  17.4   0.0001  0.59  utx0661-->sio0661          
-0.036 0.025-0.040  -2.5  -3.0   4.4  -0.0050  0.83  utx0661-->gfz0661          
 0.029-0.099-0.079  -0.5  -1.7   4.2  -0.0347  0.52  utx0661-->jpl0661          
                                                                                
-0.056 0.020-0.131  -1.9  -1.8 -12.9  -0.0048  0.77  sio0661-->gfz0661          
-0.013-0.111-0.185   0.0  -0.1 -13.0  -0.0347  0.42  sio0661-->jpl0661          
                                                                                
 0.049-0.132-0.027   2.1   1.2   0.0  -0.0301  0.75  gfz0661-->jpl0661          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 5 OF GPS WEEK 661 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48875              10      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
                                                                                
-0.071-0.088-0.047  -2.4   1.9  -0.1  -0.0008  0.71  esa0661-->emr0661          
 0.009-0.113-0.020   1.1   4.0  -3.7  -0.0024  0.78  esa0661-->utx0661          
-0.011-0.111 0.032   0.9   2.8  14.6  -0.0014  0.84  esa0661-->sio0661          
-0.180-0.042-0.068  -0.5   2.3   2.2  -0.0049  1.02  esa0661-->gfz0661          
-0.053-0.209-0.124   0.1   2.2   0.7  -0.0356  0.70  esa0661-->jpl0661          
                                                                                
 0.079-0.025 0.026   3.5   2.1  -3.6  -0.0016  0.52  emr0661-->utx0661          
 0.063-0.024 0.077   3.2   0.8  14.7  -0.0007  0.47  emr0661-->sio0661          
-0.109 0.045-0.021   1.8   0.3   2.3  -0.0041  0.84  emr0661-->gfz0661          
 0.032-0.114-0.077   2.6   0.3   0.6  -0.0348  0.36  emr0661-->jpl0661          
                                                                                
-0.012-0.001 0.049  -0.3  -1.3  18.2   0.0008  0.57  utx0661-->sio0661          
-0.189 0.070-0.048  -1.7  -1.8   5.8  -0.0025  0.94  utx0661-->gfz0661          
-0.011-0.089-0.092  -0.6  -1.9   4.3  -0.0337  0.55  utx0661-->jpl0661          
                                                                                
-0.152 0.098-0.094  -1.3  -0.7 -12.5  -0.0042  0.83  sio0661-->gfz0661          
-0.020-0.090-0.145  -0.5  -0.5 -13.7  -0.0346  0.42  sio0661-->jpl0661          
                                                                                
 0.161-0.172-0.062   0.9   0.0  -1.6  -0.0309  0.83  gfz0661-->jpl0661          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 6 OF GPS WEEK 661 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48876              11      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
                                                                                
-0.006 0.004 0.042  -1.3   0.5  -0.5   0.0006  0.83  esa0661-->emr0661          
-0.054-0.004-0.001   1.8   4.3  -1.7  -0.0003  0.85  esa0661-->utx0661          
-0.020-0.027 0.059   2.1   0.2  14.9  -0.0008  0.90  esa0661-->sio0661          
-0.088-0.013-0.051  -0.6  -1.0   1.2  -0.0042  1.12  esa0661-->gfz0661          
-0.071-0.073-0.027   0.8   0.6   1.6  -0.0354  0.82  esa0661-->jpl0661          
                                                                                
-0.048-0.008-0.043   3.1   3.8  -1.2  -0.0009  0.46  emr0661-->utx0661          
-0.015-0.033 0.017   3.4  -0.3  15.5  -0.0013  0.46  emr0661-->sio0661          
-0.082-0.017-0.093   0.7  -1.5   1.7  -0.0048  0.76  emr0661-->gfz0661          
-0.028-0.073-0.061   2.4   0.1   1.4  -0.0361  0.35  emr0661-->jpl0661          
                                                                                
 0.035-0.027 0.060   0.3  -4.1  16.7  -0.0004  0.50  utx0661-->sio0661          
-0.034-0.009-0.050  -2.4  -5.3   2.9  -0.0039  0.84  utx0661-->gfz0661          
 0.039-0.066-0.013  -0.6  -3.8   2.3  -0.0355  0.49  utx0661-->jpl0661          
                                                                                
-0.063 0.005-0.096  -2.5  -1.2 -13.9  -0.0040  0.82  sio0661-->gfz0661          
-0.005-0.041-0.079  -0.9   0.4 -14.0  -0.0351  0.45  sio0661-->jpl0661          
                                                                                
 0.065-0.056 0.031   1.7   1.6  -0.5  -0.0315  0.77  gfz0661-->jpl0661          
                                                                                
------------------------------------------------------------------------        
                                                                                
ORBIT COMPARISON FOR DAY 7 OF GPS WEEK 661 (day 1 is Sunday)                    
------------------------------------------------------------------------        
                                              Translations, RMS - meters        
MODIFIED JULIAN DATE      DAY   MONTH   YEAR  Rotations - arc sec               
       48877              12      9     1992  Scale - ppm                       
------------------------------------------------------------------------        
                                                                                
    DX    DY    DZ    RX    RY    RZ    SCALE  RMS                              
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
                                                                                
------------------------------------------------------------------------        
                                                                                